How do I retrofit my G Series beacon system from solar powered to AC powered?

This article details where to find instructions for retrofitting a G Series beacon system from solar powered to AC powered.

Product applicability

The following products are discussed in this article:

  • G Series (solar only): SC315-G, R829-G, R820-G, and R247-G

Procedure

The beacon systems referenced above are eligible for retrofitting from solar powered to AC powered with relative ease. Please refer to the retrofit guide linked below for instructions on the retrofitting process and information about the materials that are required:

Did this answer your question? Thanks for the feedback There was a problem submitting your feedback. Please try again later.